Sound Stages and Portable Buildings

MaxR Sound Stage

In response to the industry demand for sound studio space, Film Floor offer a solution in the MaxR sound stage system. The MaxR sound stage can be either a temporary, semi-permanent, or permanent structure, depending on requirements.

Due to our unique flooring system, the MaxR stage can be located on any surface and terrain. With a build time of just weeks, we can offer an acoustically treated space at dimensions of up to 30m wide, and to well over 100m in length.

Leveraging off the history and heritage of our parent company – TSG – we have unparalleled experience of providing expert solutions to the event and retail sectors, having been integral in the 2012 Olympic Games, and the 2014 Commonwealth Games.

MaxR Soundtage 1
MaxR Soundtage 2

Our most recent project has been a 40m x 20m sound stage structure at Langleybury Farm Studios. Built using our unique leg system, it utilises space that was previously allocated to car parking, and offers an innovative under floor solution to the provision of services.

The MaxR system is a multi-purpose structure, with variable specifications. It therefore makes a perfect solution workshop space, prop storage and comfortably meets all the exacting requirements of the Film Industry.

Because of the semi-permanent nature of the building, it is very often looked upon in a favourable light by the planning authorities. This can negates the sometimes very long and painful process experienced when negotiating a permanent structure.

Film Floor Ltd offers multiple of investment options to our clients. These range from joint ventures whereby zero Capital Expenditure is required, to sale and buy back or outright sale. Deals are structured to suit the needs and finances of each individual customer.

  • The MaxR sound stage can be either a temporary, semi-permanent, or permanent structure, depending on requirements
  • MaxR stage can be located on any surface/terrain
  • Build time of just weeks, acoustically treated, dimensions of up to 30m wide 100m+ length
  • Provides an innovative under floor solution to the provision of services
  • The MaxR system is a multi-purpose structure, with variable specifications. Offers perfect workshop space/prop storage solution
  • Semi-permanent construction, planning authorities  often view more favourably

Sound Stages

The latest addition to the Film Floor portfolio - we can now offer a heavy deck based structure, strong enough to allow forklifts to operate within a truly mobile, semi permanent film set. Available in either skeletal form as high clearance workshops, or soundproofed to 65dba in order to facilitate the most delicate of film work. This amazing solution can be constructed within hours in a field location environment, and has never been available to the film the industry prior to Film Floor Ltd

Portable Buildings

Portable buildings are an extension of the flooring system described above. Forming modular rooms for on site technical buildings such as workshops or production offices. Easy to install from flat pack – no wastage, environmentally friendly, needing no ground preparation which can be placed on any terrain.